San Marcos Elementary School


1 2 3

The project scope included mechanical and plumbing design services for a new 70,000 square elementary school consisting of two building, each of which contains classrooms, administration spaces and cafeteria facilities. Mechanical system design included package rooftop gas/electric air conditioning units.

Design Features

  • 190+ tons of rooftop HVAC units
  • Direct vent water heaters
  • Grease waste interception system
  • Integration into District’s controls system
  • Site gas distribution to each building
  • Specialized linear air distribution
  • 100% makeup air units
Divider

Other School Projects