Hyatt – Central Plant Modifications
Mechanical engineering services including HVAC design for a remodel of the existing central plant. The facility includes new cooling tower and chillers. The remodeled central plant was closely coordinated to limit Hotel operations.
Design Features
- 1000 ton 4-pipe central plant
- New 3200 GPM cooling tower
- New flow meters
- Replace all existing control valves
- Limited any hotel shut downs
